EIA Report

 

1 EIA Report of Matarbari 600×2 MW Coal Fired Power Plant Project Download
2 EIA Report of Transmission Line under RE Component Download
3 EIA report of 6.5 km Long embankment Cum Road Construction from Rajghat Bridge, Matarbari to Mohiraghona, Dhalghata Download
Flash News

  • DOE has approved EIA Report of Transmission Line under RE Component
  • MOU signed Between Coal Power Generation Company Bangladesh Limited and Sembcorp Utilities Pte. Ltd., Singapore for the Implementation of Phase 1of the 2X700 MW Matarbari Coal Fired Power Project
  • DOE has approved EIA Report of Matarbari 2x600 MW Coal Fired Power Plant Project
  • CPGCBL has prepared draft Township Development Plan
  • CPGCBL has prepared draft Area Development Plan
  • Loan Agreement for Matarbari Ultra Super Critical Coal Fired Power Project Signed on 16 June 2014
  • CPGCBL has prepared draft PPA, IA 
  • CPGCBL Engaged Matarbari JVC as Consultant for Matarbari USC Coal Fired Power Project
  • Land Acquisition Completed